| December 2011 Wastewater Plant Usages |
|
· Wastewater treated during the month of December 2011 was 141,890,000. Average wastewater treated was 4.58 MGD; peak day was 11.26 MGD. Year-to-date wastewater treated is 707,380,000 gallons. Year-to-date average day is 3.85 MGD. Influent BOD averaged 14,717 lbs/day. Maximum day influent BOD loading was 16,253 lbs. The plant is designed to treat 39,000 lbs/day of BOD. Influent TSS average 6,304 lbs/day. Maximum day influent TSS loading was 11,615 lbs. The plant is designed to treat 21,000 lbs/day of TSS. Average day BOD loading was 38% of capacity. Average day TSS loading was 30% of capacity. Removal efficiency for BOD was 98% and for TSS was 98%. Estimated bypass from the wastewater treatment plant was 0 gallons. Estimated bypass from the collection system was 1,541,520 gallons. Average day hydraulic loading was 64% of capacity.
· Total sludge to the belt filter presses for December 2011 was 170.30 dry tons; average day was 12.20 dry tons. YTD sludge to the belt filter presses is 1,089.00 dry tons. Total Class A Biosolids produced for December 2011 was 299.50 dry tons; average day was 21.40 dry tons. YTD biosolids produced is 1,898.80 dry tons.
|
|